EuroStar Group Factories
 Antiquity
Antiquity
Mr Ali Nekonam is the owner and technology manager of the Eurostar brand. The company began its operations in Europe in 1995 and in Iran in 2005. Currently, Eurostar operates legally in Spain, Iran, Georgia, Iraq and Turkey.
 Price
Price
Eurostar projects are completed quickly and within a single fiscal year. The project timeline runs concurrently with the panel construction in the factory, and the project managers adhere to this timeline to prevent cost overruns. As a result, the project is completed at the price agreed upon in the contract, and 14.5% of the finishing costs are eliminated.
 Speed
Speed
the highest speed in completing projects
 Persistence
Persistence
In this structure, only rebar and concrete are used. The architectural plan is completely formworked with modular titanium and alloyed aluminium panels, and the concrete is poured monolithically and in situ. According to global standards, the lifespan of reinforced concrete is 300 years. The innovative execution method of the Euro Star structural system is unique in the country and has no equivalent, and its exclusivity is held by Mr. Ali Nikounam, the technology holder. To better understand the execution method, we invite you to watch the animation on this page.
 Ornament
Ornament
The advantage of the Euro Star Additive industrial system in concrete is that it waterproofs the structure. Traditional structures don't last long in humid and damp climates, but this problem has been resolved in the Euro Star technology. Also, due to the integrated structure of the reinforced concrete box, the structure is earthquake-resistant and does not create debris in the event of demolition. There is no similar structure in the country. The 300-year lifespan of this structure also helps to reduce inflation in construction projects by up to 60%, which is a very important feature.
 Quality
Quality
The entire construction team for the modular structure is technical, including the reinforcing steel team, electricians, mechanics, formwork team, surveyors, concrete pourers, reformers, and curing team. All are trained and certified professionally by the Technical and Construction Deputy of the Euro Star Spain group, who supervise the precise implementation of the entire architectural plan during daily concrete pouring. No untrained or traditional personnel are employed in the construction of the structure. The use of the best materials available in Europe is a priority, and traditional personnel will not be used on this project under any circumstances.
About Us

Welcome to Euro Star Complex

This company is the first producer of modular aluminum panels in Spain. Such panels are produced in the factories and workshops of this company and specialized and efficient human power were chosen for cooperation in different levels from designing to implementing. The big honor of this company is producing a structure without rubble with latest technology as well as high and unique quality in Iran. We hope it can be developed in all countriesthat are in the risk of earthquake to establish an industrial and safe structure with long life and employment.

According to the standard calculations and estimations of Europe` this structure has the life of 150 years and it is 100% anti aearthquake (without rubble) and 100% waterproof.

Safety and beauty of the home we live in is divine right of the people in this country. We hope that someday the local technology of this company and the similar technologies are replaced by the traditional and semi-industrial methods of construction as soon as possible so that it can deal with faults in Iran and the fertile lands are not destroyed and the calculated structure is established based on the standards of inland and global bylaws.